Eko Electricity Distribution Plc (EKEDP) is reintroducing the MAP Scheme, giving customers a direct path to get metered through accredited vendors — alongside the free DISREP metering initiative for eligible households.
Review the required technical specification for your meter type, then place an order through an accredited MAP vendor.
| Meter type | Specification document |
|---|---|
| Single-Phase Meter | View document → |
| Three-Phase Meter | View document → |
Eko Electricity Distribution Plc (EKEDP) is rolling out FREE smart prepaid meters to eligible customers under the Distribution Sector Recovery Programme (DISREP) Metering Initiative—helping close the metering gap and putting an end to estimated billing.
See if you qualify
Per the Order on Deregulation of Meter Prices for the MAP Scheme. Figures below are reproduced exactly as published across both source price tables (VAT-exclusive and VAT-inclusive).
| MAP vendor | 1-phase, excl. VAT | 3-phase, excl. VAT | 1-phase, incl. VAT | 3-phase, incl. VAT |
|---|---|---|---|---|
| Bendoriks | 130,612.50 | 204,250.00 | 130,612.50 | 204,250.00 |
| Gospell Digital | 139,750.00 | 247,250.00 | 139,750.00 | 247,250.00 |
| Gosslink Engineering | 140,825.00 | 230,050.00 | 140,825.00 | 230,050.00 |
| G-Unit | 138,643.01 | 233,816.80 | 138,643.01 | 233,816.80 |
| Holley Metering | 118,665.00 | 188,783.99 | 118,665.00 | 188,784.00 |
| Mojec | 129,000.00 | 220,375.00 | 129,000.00 | 220,375.00 |
| NG Electrometer | 130,867.52 | 213,234.94 | 130,876.52 | 213,234.94 |
| Paktim Metering | 134,375.00 | 230,050.00 | 134,375.00 | 230,050.00 |
| Quantum Manu | 137,600.00 | 234,350.00 | 137,600.00 | 234,350.00 |
| Skipper Nigeria | 116,590.20 | 212,675.85 | 116,590.20 | 211,471.85 |
| Skyrun Electric | 124,700.00 | 210,700.00 | 124,700.00 | 210,700.00 |
| MBH | 128,462.50 | 220,375.00 | 119,500.00 | 205,000.00 |
| Inland Power | 132,499.99 | 117,000.00 | 125,775.00 | 225,500.00 |
| Integrated Resources | 123,840.00 | 204,787.50 | 123,840.00 | 204,787.50 |
| KELM | 121,475.00 | 216,075.00 | 121,475.00 | 216,075.00 |
| Turbo | 146,458.14 | 246,356.14 | 146,458.14 | 246,356.14 |
| Wellsun Intelligent | 119,893.16 | 200,614.59 | 117,340.60 | 200,614.60 |
All prices in NGN. Note: the source tables show diverging figures for MBH, Inland Power and Wellsun Intelligent between the excl.-VAT and incl.-VAT versions (in Inland Power's case, the excl.-VAT 3-phase figure is lower than its 1-phase figure) — worth confirming with the finance/pricing team before publishing externally.
This scheme runs concurrently with the National Mass Metering Programme (NMMP).
Browse the full list of licensed contractors recognised by EKEDP.
Confirm your installation form, check vending activation, and find the pairing and balance-check details for your specific meter type.
Sent automatically to the email address submitted during KYC, immediately after installation. The installer can add extra recipient emails before submission.
Enter your meter number on any available payment channel — if activated, your customer name should be returned.
Meters ship with preloaded units; the value is deducted at first vending, or across subsequent vends.
| Meter number prefix | Preloaded units (kWh) |
|---|---|
| 04********* | 100 |
| 43********* | 100 |
| 95********* | 20 |
| 45********* | 200 |
| 0179********* | 100 |
| 0101********* | 300 |
| 62********* | 100 |
Select the prefix that matches your meter number for pairing steps and the balance-check code.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is connected directly to the load side of the meter (not via inverter or ATS). If out of units, keep batteries in the CIU and switch on utility supply, not an alternative source.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is connected directly to the load side of the meter (not via inverter or ATS). If out of units, keep batteries in the CIU and switch on utility supply, not an alternative source.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is connected directly to the load side of the meter (not via inverter or ATS). If out of units, keep batteries in the CIU and switch on utility supply, not an alternative source.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is connected directly to the load side of the meter (not via inverter or ATS). If out of units, keep batteries in the CIU and switch on utility supply, not an alternative source.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.
Ensure the CIU is powered (battery or supply), within proximity to the meter, and paired with the meter.